I got the socket that will hold the 39SF020A in with power and a ceramic decoupling cap:

And here is a set of 8 10K resistors for pullups/pulldowns:

There is no power for these. It will all be wire-wrapped.

Finally, it is worth pointing out that it is 8:30 on a Friday night. All work and play makes Jack a dull boy. So a little Alaskan Amber is always a way to make wire-wrapping more fun:

Now to actually start wire-wrapping. 18 address lines, 8 data lines, and 3 bus control lines. As well as the pull-up on the enable going into the CPLD. That’s 31 tiny wires and 62 stripped ends!

Next post will have pictures….